Question: Generic project management practices often advocate creating a work breakdown structure as the first artifact produced by a project. What is wrong with this practice

Generic project management practices often advocate creating a work breakdown structure as the first artifact produced by a project. What is wrong with this practice from an architectural perspective?

Step by Step Solution

3.55 Rating (152 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

Creating a work breakdown structure WBS as the first artifact in project management is a common practice but from an architectural perspective there are some potential drawbacks and limitations to con... View full answer