A quality control inspector is studying the alternative sampling plans (n = 5, a = 1) and

Question:

A quality control inspector is studying the alternative sampling plans (n = 5, a = 1) and (n = 25, a = 5).

a. Sketch the operating characteristic curves for both plans, using lot fractions defective .05, .10, .20, .30, and .40.

b. As a seller producing lots with AQL = .10, which of the two sampling plans would you prefer? Why?

c. As a buyer wanting to protect against accepting lots with fraction defective exceeding p1 = .30, which of the two sampling plans would you prefer? Why?

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  answer-question

Statistics For Engineering And The Sciences

ISBN: 9781498728850

6th Edition

Authors: William M. Mendenhall, Terry L. Sincich

Question Posted: