Question: The second floor of a light manufacturing building is constructed from a 5-in.-thick stone concrete slab with an added 4-in. cinder concrete fill as shown.

The second floor of a light manufacturing building is constructed from a 5-in.-thick stone concrete slab with an added 4-in. cinder concrete fill as shown. If the suspended ceiling of the first floor consists of metal lath and gypsum plaster, determine the dead load for design in pounds per square foot of floor area.

-4 in. cinder fill – 5 in. concrete slab ceiling

-4 in. cinder fill 5 in. concrete slab ceiling

Step by Step Solution

3.52 Rating (162 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

From Table 13 5in concrete slab 125 600 4in cinder fill 94 360 metal lath plaster 100 Total ... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (2 attachments)

PDF file Icon

1589_60619c5adb11d_672375.pdf

180 KBs PDF File

Word file Icon

1589_60619c5adb11d_672375.docx

120 KBs Word File

Students Have Also Explored These Related Structural Analysis Questions!