Question: The second floor of a light manufacturing building is constructed from a 5-in.-thick stone concrete slab with an added 4-in. cinder concrete fill as shown.

-4 in. cinder fill 5 in. concrete slab ceiling
Step by Step Solution
3.52 Rating (162 Votes )
There are 3 Steps involved in it
From Table 13 5in concrete slab 125 600 4in cinder fill 94 360 metal lath plaster 100 Total ... View full answer