Question: 15. Use a spreadsheet program to develop the MRP records for parts A and B from the following product structure. Use the data from the
15. Use a spreadsheet program to develop the MRP records for parts A and B from the following product structure. Use the data from the following table:


a. What are the planned orders for item B?
b. On an unlucky day (it must have been the 13th), the planner for part A found that the inventory was wrong by 13 units. Instead of 63, there were only 55 on hand. What happens to the planned orders for part B?
c. Use the spreadsheet model to generate a 10-period material plan for parts A and B. Assume that the 63 units of inventory for A were correct. Suppose that in period 1, actual demand for part A was 60 units instead of 50. Regenerate the spreadsheet for periods 2 through 11. What changes occur in the material plans for parts A and B?
Part Requirements Initial inventory balance Lead time Lot size Safety stock Scheduled receipt A 50/period 63 B | 00 8 1 250 1 lot-for-lot 10 250 in period 1