Question: PowerWorld Simulator case Problem 11.26 duplicates Example 11.10, except with the synchronous generator initially supplying (100 mathrm{MW}) at unity power factor to the infinite bus.
PowerWorld Simulator case Problem 11.26 duplicates Example 11.10, except with the synchronous generator initially supplying \(100 \mathrm{MW}\) at unity power factor to the infinite bus.
(a) Derive the initial values for \(\delta, E_{q}^{\prime}, E_{d}^{\prime}\) and \(E_{f d}\).
(b) Determine the critical clearing time for the Example 11.10 fault.
Data From Example 11.10:-


Data From Example 11.11:-

Data From Example 11.3:-

Data From Example 11.6:-

Figure 11.4:-

Figure 11.24:-

For the system from Example 11.3, with the synchronous generator modeled us- ing a two-axis model, determine a) the initial conditions, and then b) use Power- World Simulator to determine the critical clearing time for the Example 11.6