Question: There are 10 jobs waiting to be processed at a resource. The total processing time across those jobs is 200 minutes. During the period of

There are 10 jobs waiting to be processed at a resource. The total processing time across those jobs is 200 minutes. During the period of time in which those jobs are processed, what is the flow rate through the resource (jobs per hour)?