Question: Develop a computer program to estimate hourly production and unit cost of rock excavation by ripping. Input should include length of each pass, average ripper
Develop a computer program to estimate hourly production and unit cost of rock excavation by ripping.
Input should include length of each pass, average ripper speed, effective depth of ripping, spacing of passes, turning time at the end of each pass, job efficiency, hourly operator cost, and hourly machine cost including ripper tips, shanks, and shank protectors. Solve Problem 5 using your computer program.
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts