Question: Input should include rated shovel size, type of material, angle of swing, heaped bucket capacity, bucket fill factor, soil load factor, and job efficiency. Output
Input should include rated shovel size, type of material, angle of swing, heaped bucket capacity, bucket fill factor, soil load factor, and job efficiency. Output should be in bank measure if the soil load factor is input; otherwise, it should be in loose measure.