Question: Using the following cost matrix, determine (a) optimal job assignment, and (b) the cost of assignments. Machinist ABCDE 1 2 Job 587440 422226 33868 9

Using the following cost matrix, determine

(a) optimal job assignment, and

(b) the cost of assignments.

Machinist ABCDE 1 2 Job 587440 422226 33868 9 37550 10

Machinist ABCDE 1 2 Job 587440 422226 33868 9 37550 10