Question: Solve the assignment problem given in Example 6.1 for optimal solution using HAM. The information is reproduced in Table 6.7. TABLE 6.7 Time Taken (in
Solve the assignment problem given in Example 6.1 for optimal solution using HAM. The information is reproduced in Table 6.7.

TABLE 6.7 Time Taken (in minutes) by 4 Workers Job Worker A B 1 444 234 45 40 57 42 49 52 41 45 C48 D 51 67 63 55 48 64 60 55