Question: Suppose in the previous problem that DISC always needs a conveyor belt system; when one wears out, it must be replaced. Which project should the
Suppose in the previous problem that DISC always needs a conveyor belt system; when one wears out, it must be replaced. Which project should the firm choose now?
Previous problem
Dangerfield Industrial Systems Company (DISC) is trying to decide between two different conveyor belt systems. System A costs $430,000, has a four-year life, and requires $110,000 in pretax annual operating costs. System B costs $570,000, has a six-year life, and requires $98,000 in pretax annual operating costs. Both systems are to be depreciated straight-line to zero over their lives and will have zero salvage value. Whichever project is chosen, it will not be replaced when it wears out. If the tax rate is 34 percent and the discount rate is 11 percent, which project should the firm choose?
Step by Step Solution
3.45 Rating (165 Votes )
There are 3 Steps involved in it
Given data System A NPV 54184317 Operating life ... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
1143-B-C-F-S-V(704).xlsx
300 KBs Excel File
