Question: Suppose two truck services are being considered for deliveries from a company plant to one of its warehouses. Service B is cheaper but slower and
Demand (known) ........................................... 9,600 cwt./year
Order cost .................................................... $100/order
Product price, f.o.b. source ................................ $50/cwt.
Shipping quantity ........................................... As per EOQ
In-transit carrying cost ...................................... 20%/year
Inventory-carrying cost ..................................... 30%/year
In-stock probability during the lead time ................. 90%
Out-of-stock costs ........................................... Unknown
Selling days ................................................... 365 days/year
.png)
A reorder point control method of inventory control is used at the warehouse. From the point of view of the inventory in the warehouse, which truck service should be selected?
Service 4 days 1.5 days $12.00/cwt 5 days 1.8 days $11.80/cwt Transit time (LT) Variability (std. dev, SLy) Rate
Step by Step Solution
3.45 Rating (187 Votes )
There are 3 Steps involved in it
This problem is one of balancing transport costs with the indirect costs associated with inventories ... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
928-B-M-L-S-C-M (4647).docx
120 KBs Word File
