Question: The average part produced in a certain batch manufacturing plant must be processed sequentially through six machines on average. Twenty (20) new batches of parts
(a) Manufacturing lead time for an average part,
(b) Plant capacity,
(c) Plant utilization.
(d) How would you expect the non operation time to be affected by the plant utilization?
Step by Step Solution
3.39 Rating (158 Votes )
There are 3 Steps involved in it
a MLT 65 2501 10 105 hr b T p 5 25 x 0125 030 hrpc R p 3333 pchr PC 701833336 700 pcweek c P... View full answer