Question: The controller for Washington Co. established the following overhead cost pools and cost drivers: a. What is the overhead rate per machine hour if the
.png)
a. What is the overhead rate per machine hour if the number of machine hours (MHs) is used as a single cost driver under traditional costing system?
b. Utilizing traditional costing, how much overhead is assigned to the order based on machine hours as a single cost driver?
c. Utilizing ABC, how much total overhead is assigned to the order?
Estimated Budgeted Cost Driver Level Overhead Overhead Cost Pool Cost Driver $60,000 # of inspections $100,000 # of setups Quality controls 2,000 inspections Machine setups 20,000 setups $90,000 # of machine hrs 2,500 Other overhead costs machine hrs Total overhead costs $250,000 A recent order for sailboats used: 400 inspections Quality inspections Machine setups 2,500 setups 300 machine hours Machine hours (MHs)
Step by Step Solution
3.39 Rating (174 Votes )
There are 3 Steps involved in it
a Over head rate per machine hour if the number of machine hours MHs is used as a single cost d... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
1019-B-F-A-F-V(1001).docx
120 KBs Word File