Question: The controller is satisfied with the graphical representation you prepared in conjunction with 15-40. She thinks this graphical representation of variable overhead variances will be
(1) Fixed overhead is applied to production on the basis of standard machine hours allowed for the output of the period (the standard total overhead cost per machine hour is $10, while the standard variable overhead cost per machine hour is $6);
(2) During the example case, there was a favorable production-volume variance and an unfavorable spending (budget) variance for fixed overhead. Based on these assumptions, the controller has asked you to complete the following graph.
.png)
Required
1. (A) =?
2. (B) =?
3. (C) =?
4. (D) =?
5. (E) =?
6. (F) =?
7. (G) =?
8. (H) =?
9. (I) =?
10. Vertical distance (J) =?
11. Vertical distance (K) =?
12. Vertical distance (L) =?
Slope of Line (D)
Step by Step Solution
3.44 Rating (167 Votes )
There are 3 Steps involved in it
A Fixed Overhead Cost label B Machine Hours Activity Measure for ... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
249-B-M-L-O-M (1174).docx
120 KBs Word File
