Question: There is a 3 percent error rate at a specific point in a production process. If an inspector is placed at this point, all the

There is a 3 percent error rate at a specific point in a production process. If an inspector is placed at this point, all the errors can be detected and eliminated. However, the inspector is paid $ 8 per hour and can inspect units in the process at the rate of 30 per hour.
If no inspector is used and defects are allowed to pass this point, there is a cost of $ 10 per unit to correct the defect later on.
Should an inspector be hired?

Step by Step Solution

3.52 Rating (172 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

Defective average 03 inspection rate 30 per hour ... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

287-B-M-L-S-C-M (1538).docx

120 KBs Word File

Students Have Also Explored These Related Management Leadership Questions!