Question: There is a 3 percent error rate at a specific point in a production process. If an inspector is placed at this point, all the
If no inspector is used and defects are allowed to pass this point, there is a cost of $ 10 per unit to correct the defect later on.
Should an inspector be hired?
Step by Step Solution
3.52 Rating (172 Votes )
There are 3 Steps involved in it
Defective average 03 inspection rate 30 per hour ... View full answer