Question: Two machines (a grinding machine and a rolling machine) are required to make each of five products with the processing time, average lot size, and
.png)
Product A Product B 30,000 1,000 Product CProduct D Product E 20,000 2,000 10,000 Annual demand Average lot size Grinding machine 24,000 3,000 800 Processing time (minutes) Setup time (minutes) 100 240 400 150 90 Rolling machine Processing time (minutes) Setup time (minutes) 0.5 1.5 70 100 45
Step by Step Solution
3.66 Rating (161 Votes )
There are 3 Steps involved in it
Machine Shop Table 1013 Product A Product B Product C Product D Product E Annual demand 20000 30000 ... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
792-B-M-L-S-C-M (4594).docx
120 KBs Word File
