Question: A cold-storage building 16 35 m is built on a concrete slab having a thickness of 15 cm, which is placed on a suitable

A cold-storage building 16 × 35 m is built on a concrete slab having a thickness of 15 cm, which is placed on a suitable insulating material in contact with the ground. During the start-up period the interior of the building is exposed to convection air with h = 20 W/m2 · ºC and T = −15ºC. The ground temperature may be taken as +15ºC. The design objective is to achieve a steady-state temperature of 0ºC at the inside surface of the concrete floor. Consider different insulating materials and thicknesses and recommend a selection that will achieve a cooldown within a reasonable period of time. For the design, take into account only the floor slab of the building.

Step by Step Solution

3.41 Rating (164 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

The thermal resistance between the slab in contact with the gro... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

892-P-T-H-T (859).docx

120 KBs Word File

Students Have Also Explored These Related Thermodynamics Questions!