Question: a. Construct a control chart with Three Sigma limits for the number of defects per spool of cable based on the following data. Is the
b. If a new spool has five defects, using the control chart of part a, has the process changed?
.png)
Observation 1 2 3 4 5 6 7 8 9 10 1 12 13 14 Number of defects2 3 1 0 13 2 0 2 1 3 1 2 O
Step by Step Solution
3.53 Rating (167 Votes )
There are 3 Steps involved in it
a b c2114 15 Control Limits 315315 15 367 UCL is 51... View full answer