Question: A manufacturing manager uses a dexterity test on 20 current employees in order to predict watch production based on time to completion (in seconds). A
A manufacturing manager uses a dexterity test on 20 current employees in order to predict watch production based on time to completion (in seconds). A portion of the data is shown below.
Time (seconds)......................Watches per Shift
513.......................................................23
608.......................................................19
⋮............................................................⋮
437.......................................................20
a. Estimate the linear model: Watches = β0 + β1 Time + ε. Interpret the slope coefficient. If the time required to complete the dexterity test is 550 seconds, what is the predicted watch production?
b. Estimate the logarithmic model: Watches = β0 + β1 In (Time) + ε. Interpret the slope coefficient. If the time required to complete the dexterity test is 550 seconds, what is the predicted watch production?
c. Which model provides a better fit? Explain.
Step by Step Solution
3.63 Rating (160 Votes )
There are 3 Steps involved in it
a The sample regression equation is As the time increases by 1 second the number of wat... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
1140-M-S-L-R(8758).docx
120 KBs Word File
