Question: A manufacturing manager uses a dexterity test on 20 current employees in order to predict watch production based on time to completion (in seconds). A

A manufacturing manager uses a dexterity test on 20 current employees in order to predict watch production based on time to completion (in seconds). A portion of the data is shown below.

Time (seconds)......................Watches per Shift

513.......................................................23

608.......................................................19

⋮............................................................⋮

437.......................................................20

a. Estimate the linear model: Watches = β0 + β1 Time + ε. Interpret the slope coefficient. If the time required to complete the dexterity test is 550 seconds, what is the predicted watch production?

b. Estimate the logarithmic model: Watches = β0 + β1 In (Time) + ε. Interpret the slope coefficient. If the time required to complete the dexterity test is 550 seconds, what is the predicted watch production?

c. Which model provides a better fit? Explain.

Step by Step Solution

3.63 Rating (160 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

a The sample regression equation is As the time increases by 1 second the number of wat... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

1140-M-S-L-R(8758).docx

120 KBs Word File

Students Have Also Explored These Related Statistics Questions!