Question: A manufacturing manager uses a dexterity test on 120 current employees in order to predict watch production based on time to completion (in seconds) and

A manufacturing manager uses a dexterity test on 120 current employees in order to predict watch production based on time to completion (in seconds) and a Male dummy variable. A portion of the data is shown in the accompanying table. 

Watches 28 33 THE 24 Time 503 534 518 Male 1 1


a. Estimate the linear model Watches = β0 + β1Time + β2Male + ɛ. Interpret the slope coefficient for Time. If the time required to complete the dexterity test is 550 seconds, what is the predicted watch production for male and female employees? 

b. Estimate the logarithmic model Watches = β0 + β1ln(Time) + β2Male + ɛ. Interpret the slope coefficient for ln(Time).If the time required to complete the dexterity test is 550 seconds, what is the predicted watch production for male and female employees? 

c. Which model provides a better fit? Explain.

Watches 28 33 THE 24 Time 503 534 518 Male 1 1 1

Step by Step Solution

3.55 Rating (165 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

a On average for every 50 seconds increase in the time that an employee spends on making watches the... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Business Statistics Communicating Questions!