Question: A new machine has just been installed to cut and rough-shape large slugs. The slugs are then transferred to a precision grinder. One of the
A new machine has just been installed to cut and rough-shape large slugs. The slugs are then transferred to a precision grinder. One of the critical measurements is the outside diameter. The quality control inspector randomly selected five slugs each half-hour, measured the outside diameter, and recorded the results. The measurements (in millimeters) for the period 8:00 a.m. to 10:30 a.m. follow.
.png)
a. Determine the control limits for the mean and the range.
b. Plot the control limits for the mean outside diameter and the range.
c. Are there any points on the mean or the range chart that are out of control? Comment on thechart.
Outside Diameter (millimeters) Time 8:00 8:30 9:00 9:30 10:00 10:30 87.1 86.9 87.5 86.0 87.1 88.0 87.3 88.5 88.4 88.0 87.1 86.2 87.9 87.6 86.9 87.2 87.1 87.4 87.0 87.5 87.6 87.6 87.1 87.3 87.0 87.4 88.2 87.1 87.1 87.8
Step by Step Solution
3.42 Rating (171 Votes )
There are 3 Steps involved in it
a b c X 873... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
356-M-S-Q-C-B-S (45).docx
120 KBs Word File
