Question: A proposal for panel caving a massive ore zone using undercuts 250 ft by 600 ft (76.2 183 m) in plan and 14 ft
A proposal for panel caving a massive ore zone using undercuts 250 ft by 600 ft (76.2 × 183 m) in plan and 14 ft (5.4 m) high is made. If the bulking porosity is 0.075 and caving occurs directly over the undercut, how high above the undercut will the cave zone extend? Draw of ore removes solid material and creates additional void space. If caving extends to the surface, estimate the tons of ore drawn (12 ft3/ton, 0.34m3/ton), if the draw rate is 50,000 tpd, what is the elapsed time from undercut completion until the draw appears at the surface?
Step by Step Solution
3.40 Rating (163 Votes )
There are 3 Steps involved in it
Given Rock and joint data depth4650 ft panel cave 250 600 ft in plan 14 ft high bulk... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
26-E-G-R (320).docx