Question: A sewer pipe must be laid from a starting invert elevation of 650.73 ft at station 9+25 to an ending invert elevation 653.81 ft at

A sewer pipe must be laid from a starting invert elevation of 650.73 ft at station 9+25 to an ending invert elevation 653.81 ft at station 12+75. Determine the uniform grade needed, and calculate invert elevations at each 50-ft station.