As part of a major plant renovation project, the industrial engineering department has been asked to balance
Question:
Do each of the following:
a. Draw the precedence network.
b. Determine tire required cycle time.
c. Determine the minimum number of workstations needed.
d. Assign the tasks to workstations using the heuristic rule €œAssign the task with the most followers.€ Use the heuristic rule €œAssign the task with the longest time€ as a tiebreaker, If a tie still exists, choose randomly,
e. Calculate the percentage idle time for the assignments in part d.
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Related Book For
Operations Management
ISBN: 978-0071091428
4th Canadian edition
Authors: William J Stevenson, Mehran Hojati
Question Posted: