A city is in need of increasing its rubbish disposal facilities. There is a choice of two

Question:

A city is in need of increasing its rubbish disposal facilities. There is a choice of two rubbish disposal areas, as follows. Area A: A gravel pit with a capacity of 16 million cubic meters. Owing to the possibility of high ground water, however, the Regional Water Pollution-Control Board has restricted the lower 2 million cubic meters of fill to inert material only (earth, concrete, asphalt, paving, brick, etc.). The inert material, principally clean earth, must be purchased and hauled to this area for the bottom fill. Area B: Capacity is 14 million cubic meters. The entire capacity may be used for general rubbish disposal. This area will require an average increase in a round-trip haul of 5 miles for 60% of the city, a decreased haul of 2 miles for 20% of the city. For the remaining 20% of the city, the haul is the same distance as for Area A. . Assume the following conditions:

• Cost of inert material placed in Area A will be

•. $2.35 1m3. Average speed of trucks from last pickup to disposal site is 15 miles per hour. The rubbish truck and a two-man crew will cost $35 per hour.

•Truck capacity of 41/2tons per load or 20 m3.

• Sufficient cover material is available at all areas; however, inert material for the bottom fill in Area A must be hauled in. Which of the sites do you recommend?

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question
Question Posted: