Question: Consider a situation where a given process goes out of control but the relevant control charts do not indicate so. Assume that the process variation

Consider a situation where a given process goes out of control but the relevant control charts do not indicate so. Assume that the process variation remains constant but the mean shifts from μ to μ + kv­, where k is a fixed constant.

a. Provided that k = 1.5 and n = 5, what is the mean number of subsamples required for X to rise above the upper control limit?

b. Provided that k = 1.5 and n = 9, what is the mean number of subsamples required for X to rise above the upper control limit?

c. Provided that k = 2.0 and n = 5, what is the mean number of subsamples required for X to rise above the upper control limit?

Step by Step Solution

3.39 Rating (168 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

Detecting out of control k n Probability Expected time Part ... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (3 attachments)

PDF file Icon

1209_60bca5b844091_565015.pdf

180 KBs PDF File

Excel file Icon

1209-M-S-D-A(9044).xlsx

300 KBs Excel File

Word file Icon

1209_60bca5b844091_565015.docx

120 KBs Word File

Students Have Also Explored These Related Statistics Questions!