Question: Consider two different machines, with two different instruction sets, both of which have a clock rate of 200 MHz. The following measurements are recorded on
.png)
a. Determine the effective CPI, MIPS rate, and execution time for each machine.
b. Comment on the results.
Instruction Count (millions) Instruction Type Machine A Cycles per Instruction Arithmetic and logic Load and store Branch Others Machine A Arithmetic and logic Load and store Branch Others 10
Step by Step Solution
3.46 Rating (162 Votes )
There are 3 Steps involved in it
a b Although machine B has a higher MIPS than ma... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
896-C-S-S-A-D (2308).docx
120 KBs Word File
