Question: Firewall Project XT. Using the complexity weighting scheme shown in Exercise and the function point complexity weighted table shown below, estimate the total function point

Firewall Project XT. Using the €œcomplexity weighting€ scheme shown in Exercise and the function point complexity weighted table shown below, estimate the total function point count. Assume historical data suggest five function points equal one person a month and six people can work on the project.


Firewall Project XT. Using the €œcomplexity weighting€ scheme sho


a. What is the estimated project duration?
b. If 20 people are available for the project, what is the estimated project duration?
c. If the project must be completed in six months, how many people will be needed for theproject?

Router systems project Cost: $600,000 Definition 10% Design 45% Implementation 50% Objectives 4% Requirements 6% In-house testing 40% Customer testing & review 10% Inputs 390 Outputs 3% Files 4% Interfaces Programming 20% 10% Complexity Weight Table Number of inputs Number of outputs Number of inquires Number of files Number of interfaces 10 20 Rated complexity low Rated complexity average Rated complexity average 30 Rated complexity high Rated complexity high

Step by Step Solution

3.47 Rating (163 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

The total function point count is Complexity Weighting ... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

177-B-M-L-P-M (1331).docx

120 KBs Word File

Students Have Also Explored These Related Management Leadership Questions!