Question: Firewall Project XT. Using the complexity weighting scheme shown in Exercise and the function point complexity weighted table shown below, estimate the total function point
.png)
a. What is the estimated project duration?
b. If 20 people are available for the project, what is the estimated project duration?
c. If the project must be completed in six months, how many people will be needed for theproject?
Router systems project Cost: $600,000 Definition 10% Design 45% Implementation 50% Objectives 4% Requirements 6% In-house testing 40% Customer testing & review 10% Inputs 390 Outputs 3% Files 4% Interfaces Programming 20% 10% Complexity Weight Table Number of inputs Number of outputs Number of inquires Number of files Number of interfaces 10 20 Rated complexity low Rated complexity average Rated complexity average 30 Rated complexity high Rated complexity high
Step by Step Solution
3.47 Rating (163 Votes )
There are 3 Steps involved in it
The total function point count is Complexity Weighting ... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
177-B-M-L-P-M (1331).docx
120 KBs Word File