For the in-line skate assembly example in this chapter, suppose the times for the individual operations are as follows: TaskTime (sec.) 1...........20 2...........10 3...........30 4...........10 5...........30 6...........20 7...........10 8...........20 Assume that inspections cannot be performed by production personnel, but only by persons from quality control. Therefore, assembly operations are separated into three groups for inspection. Design a production line to

For the in-line skate assembly example in this chapter, suppose the times for the individual operations are as follows:
TaskTime (sec.)
1...........20
2...........10
3...........30
4...........10
5...........30
6...........20
7...........10
8...........20
Assume that inspections cannot be performed by production personnel, but only by persons from quality control. Therefore, assembly operations are separated into three groups for inspection. Design a production line to achieve an output rate of 120 per hour and 90 per hour.

This problem has been solved!


Do you need an answer to a question different from the above? Ask your question!
Related Book For answer-question

OM operations management

5th edition

Authors: David Alan Collier, James R. Evans

ISBN: 978-1285451374