Question: For the stereolithography system described in Problem 10.92, estimate the time required to cure a layer defined by a 40-mm circle if adjacent lines overlap

For the stereolithography system described in Problem 10.92, estimate the time required to cure a layer defined by a 40-mm circle if adjacent lines overlap each other by 10% and the power available is 10 MW?

Step by Step Solution

3.43 Rating (162 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

Line width is 019 mm but since the adjacent lines overlap each other by 10 calculate the allowable l... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

972-E-M-E-B-D (958).docx

120 KBs Word File

Students Have Also Explored These Related Mechanical Engineering Questions!