Question: Rain is falling on a poorly designed 150-m2 flat roof of a contemporary home. The design flaw requires the water level on the roof to
(a) Taking the accumulated rain on the roof as the system, can the process before the water level reaches 5 cm be considered batch, semi-batch, or continuous? Is it transient or steady-state? Once the water starts to flow into the drains, how do your answers change?
(b) Before the water starts draining, which of the terms in the general balance equation (Equation 4.2-1) can be omitted? Why? How do your responses change after water starts draining?
(c) Water begins flowing from the roof after 30 minutes of rainfall. What will the rate of draining (L/s) be if rain continues to fall at the same rate?
Step by Step Solution
3.30 Rating (168 Votes )
There are 3 Steps involved in it
a A semi batch process with transient stat... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
1359-E-C-E-C-P(1048).docx
120 KBs Word File
