Question: Scheduling departmental manpower for a project is a very difficult task, even if slack time is available. Many managers would prefer to supply manpower at

Scheduling departmental manpower for a project is a very difficult task, even if slack time is available. Many managers would prefer to supply manpower at a constant rate rather than continually shuffle people in and out of a project.

a. Using the information shown below, construct the PERT network, identify the critical path, and determine the slack time for each node.


Scheduling departmental manpower for a project is a very difficu


b. The network you have just created is a departmental PERT chart. Construct a weekly manpower plot assuming that all activities begin as early as possible.
c. The department manager wishes to assign eight people full-time for the duration of the project. However, if an employee is no longer needed on the project, he can be assigned elsewhere. Using the base of eight people, identify the standby (or idle) time and the overtime periods.
d. Determine the standby and overtime costs, assuming that each employee is paid $300 per week and overtime is paid at time and a half. During standby time the employee draws his full salary.
e. Repeat parts c and d and try to consider slack time in order to smooth out the manpower curve. Identify the optimum manpower level so as to minimize the standby and overtime costs. Assume all employees must work full-time.
f. Would your answer to parts d and e change if the employees must remain for the full duration of the project, even if they are no longerrequired?

Personnel Required Activity A-B A-C B-D B-E C-E D-F E-F Full-time)

Step by Step Solution

3.41 Rating (164 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

Case I Earliest Start Case II CONSIDWEING SLACK Case I EARLIEST START Employees can Employees cannot ... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

93-B-M-L-P-M (840).docx

120 KBs Word File

Students Have Also Explored These Related Management Leadership Questions!