When a subsystems goals are inconsistent with the goals of another subsystem, or with the system as
Question:
When a subsystem’s goals are inconsistent with the goals of another subsystem, or with the system as a whole, it is called
a. Goal conflict.
b. Goal congruence.
c. Both definitions are wrong.
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Answer rating: 0% (1 review)
a Correct When a subsystems goals are inconsi...View the full answer
Answered By
Sumit kumar
Education details:
QUATERNARY Pursuing M.Tech.(2017-2019) in Electronics and Communication Engg. (VLSI DESIGN) from
GNIOT Greater Noida
TERTIARY B.Tech. (2012-2016) in Electronics and Communication Engg. from GLBITM Greater Noida
SECONDARY Senior Secondary School Examination (Class XII) in 2012 from R.S.S.Inter College, Noida
ELEMENTARY Secondary School Examination (Class X) in 2010 from New R.J.C. Public School ,Noida
CERTIFICATION
Summer Training in ‘WIRELESS EMBEDDED SYSTEM’ from ‘XIONEE’ for the six weeks.
EMBEDDED SYSTEM Certificate issued by CETPA INFOTECH for one day workshop.
Certificate of Faculty development program on OPTICAL COMMUNICATION and NETWORKS for one week.
5.00+
1+ Reviews
10+ Question Solved
Related Book For
Accounting Information Systems
ISBN: 9781292060521
13th Global Edition
Authors: Marshall B. Romney, Paul John Steinbart
Question Posted:
Students also viewed these Business questions
-
Mr. Scott D. Liebling, P.C. (hereinafter Plaintiff) is an attorney at law. Plaintiff maintains an attorney trust account (Account) at Mellon Bank (NJ) National Association (Mellon) * * *. Mellon uses...
-
Managing Scope Changes Case Study Scope changes on a project can occur regardless of how well the project is planned or executed. Scope changes can be the result of something that was omitted during...
-
Is it possible for an employee to have personal values that are inconsistent with the values of the organization? If so, how is this inconsistency likely to affect the employees behavior and...
-
Why does Erasmus attack Church officials in his In Praise of Folly? O For spending money on lavish art O For not allowing clergy to marry O For supporting military campaigns O For selling pardons and...
-
The following accounts and their balances were selected from the unadjusted trial balance of REO Inc., a freight forwarder, at October 31, the end of the current fiscal year: Preferred 2% Stock, $100...
-
Solve the given inequalities. Graph each solution. 1 + |6x 5| 5
-
A local theater company was seeking unpaid interns to be involved in their summer theater productions. The company hired several students from Better Business University to fill these slots. At the...
-
Norton Company, a manufacture of infant furniture and carriages, is in the initial stages of preparing the annual budget for next year. Scott Ford recently joined Nortons accounting staff and is...
-
Which Python data structure is constructed using the code below? a = {"a": 1, "b": 2, "c": 3}
-
a. In Chapter 9, you created a Tic Tac Toe game in which you used a 2D array of characters to hold Xs and Os for a player and the computer. Now create a JPanel that uses an array of nine JButtons to...
-
Which of the following is a function of an AIS? a. Reducing the need to identify a strategy and strategic position b. Transforming data into useful information c. Allocating organizational strategy...
-
Albert Heijn (or AH) is arguably the largest retail chain of Europe, owning supermarkets, convenience stores, and online shopping services in food and other goods. AH prides itself on establishing...
-
For the Nyquist plots of Problem P8.1, use the Nyquist criterion to ascertain the stability of the various systems. In each case, specify the values of N, P, and Z.
-
You have been tasked with advising senior management on whether to invest in a project that will involve purchasing a new piece of high-spec software for greater efficiency in supply and demand...
-
What is the time estimate of an activity in which the pessimistic time is 68 hours, optimistic time is 24 hours, and likely time is 48 hours? Show your work.
-
Go to http://4pm.com/category/project-plan/wbs/ and view a short tutorial on developing an effective Work Breakdown Structure. Why does this site specifically warn against creating a laundry list of...
-
Recently Kathy Smith, a project manager for a large industrial construction organization, was assigned to oversee a multimillion-dollar chemical plant construction project in Southeast Asia. Kathy...
-
The morning project team meeting promised to be an interesting one. Tensions between the representatives from marketing, Susan Scott, and finance, Neil Schein, have been building for several weeks...
-
Quantitative methods can help managers evaluate alternative sales and operations plans on the basis of cost. These methods require cost estimates for each of the controllable variables, such as...
-
on 8 For the following set of lengths 130, 170, 160, 160, 150, 190 Third quartile is: et red d out of Select one: O a. 160 a question O b. 145 O c. 175 O d. 180
-
In the Fraud and the Accounts Payable Function section, we described a fraud committed by Stanley and Phoebe and another by Veronica. For each fraud, describe controls and technology that could...
-
For the company assigned by your instructor, complete the following requirements: a. Prepare a table of entities and activities. b. Draw a context diagram. c. Draw a physical data flow diagram (DFD)....
-
For the company assigned by your instructor, complete the following requirements: a. Draw a systems flowchart. b. Prepare a control matrix, including explanations of how each recommended existing...
-
The Veterans Administration allows practice in all states with a single state license although you still must follow the scope rules within the state that you are practicing in....If the VA can do...
-
Let X be a discrete random variable with the following PMF 0.4 for k = -1 0.1 for k = 0 Px(k) = 0.3 for k = 1 0.2 for k = 2 Define a new random variable Y as Y = (X + 1). (a) Find E(X) (c) Find the...
-
Supply chain strategy which recognizes that all items are not the same, and that different item and market characteristics require different procurement and support strategies, as well as different...
Study smarter with the SolutionInn App