Consider the cooling load profile for an office building shown in Figure 9.17 . The cooling is

Question:

Consider the cooling load profile for an office building shown in Figure 9.17 . The cooling is provided by a chiller having a capacity of 1,000 kW and with an average seasonal COP of 3.5 . The noncooling profile experienced by the same office building is illustrated in Figure 9.18 . It is proposed to install an ice storage system. When making ice, the chiller has an average COP of 3.0 . Determine the SPP of installing an ice storage system if the cost of electricity is as follows:image text in transcribed

The installed cost of the TES system is $100/kW. Assume that the number of typical cooling days during the entire year both before and after the installation of the TES system is 250 days. The TES system is operated with demand-leveling control so that the power demand during on-peak hours never exceeds 500 kW (which is the maximum noncooling load).

Figure 9.18image text in transcribed

Figure 9.17image text in transcribed

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Question Posted: