Question: A process manager is considering automating a bottleneck operation. The operation receives between three and nine jobs per hour in a random fashion. The cost
A process manager is considering automating a bottleneck operation. The operation receives between three and nine jobs per hour in a random fashion. The cost of waiting associated with the jobs is estimated at $2.20 per hour. The team’s equipment choices are specified in Table 7.12. Develop a spreadsheet simulation to compare the estimated hourly cost of the three alternatives. Hint: Uniform random numbers between a and b can be generated in Excel with the formula
= RAND( ) * (b −
a) +
a. Random numbers from a normal distribution with a mean m and standard deviation s can be generated in Excel with the formula
= NORM.INV(RAND( ),m, s). (Simulate 500 jobs in each case.)
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
