Assume that for a given program 70% of the executed instructions are arithmetic, 10% are load/store, and

Question:

Assume that for a given program 70% of the executed instructions are arithmetic, 10% are load/store, and 20% are branch.

1. Given this instruction mix and the assumption that an arithmetic instruction requires 2 cycles, a load/store instruction takes 6 cycles, and a branch instruction takes 3 cycles, find the average CPI.

2. For a 25% improvement in performance, how many cycles, on average, may an arithmetic instruction take if load/store and branch instructions are not improved at all?

3. For a 50% improvement in performance, how many cycles, on average, may an arithmetic instruction take if load/store and branch instructions are not improved at all?