The following table shows results for SPEC CPU2006 benchmark programs running on an AMD Barcelona. For these
Question:
The following table shows results for SPEC CPU2006 benchmark programs running on an AMD Barcelona.
For these two benchmarks, find the geometric mean of the SPECratio.
Transcribed Image Text:
a. b. Name Intr. Count x 10° Execution Time (seconds) Reference Time (seconds) bzip2 2389 750 9650 go 1658 700 10,490
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Answer rating: 100% (6 reviews)
To find the geometric mean of the SPECratio for the two benchmarks you can use the follow...View the full answer
Answered By
Mehwish Aziz
What I have learnt in my 8 years experience of tutoring is that you really need to have a friendly relationship with your students so they can come to you with their queries without any hesitation. I am quite hardworking and I have strong work ethics. Since I had never been one of those who always top in the class and always get A* no matter what, I can understand the fear of failure and can relate with my students at so many levels. I had always been one of those who had to work really hard to get decent grades. I am forever grateful to some of the amazing teachers that I have had who made learning one, and owing to whom I was able to get some extraordinary grades and get into one of the most prestigious universities of the country. Inspired by those same teachers, I am to be like one of them - who never gives up on her students and always believe in them!
5.00+
3+ Reviews
10+ Question Solved
Related Book For
Computer Organization And Design The Hardware Software Interface
ISBN: 9780123747501
4th Revised Edition
Authors: David A. Patterson, John L. Hennessy
Question Posted:
Students also viewed these Computer science questions
-
The following table shows results for SPEC CPU2006 benchmark programs running on an AMD Barcelona. Find the SPECratio. a. b. Name Intr. Count x 10 Execution Time (seconds) Reference Time (seconds)...
-
The following table shows results for SPEC CPU2006 benchmark programs running on an AMD Barcelona. Find the CPI if the clock cycle time is 0.333 ns. a. b. Name Intr. Count x 10 Execution Time...
-
The results of the SPEC CPU 2006 bzip2 benchmark running on an AMD Barcelona has an instruction count of 2.389E12, an execution time of 750 s, and a reference time of 9650 s. 1. Find the CPI if the...
-
The table contains real data. MySpace U.S. Advertising Revenue ($ millions) (a) Determine the maximum and minimum values for each variable in the table. (b) Use your results from part (a) to find an...
-
Paxton Sheet Metal Works Inc. is about to acquire a new stamping press that costs $400,000. It is considering purchasing the asset with money it can borrow at 10% repayable in annual, year-end...
-
What are the elements required for a Continuing Criminal Enterprise conviction? Explain.
-
It would be helpful to me if I could start by asking you to basically tell me about your job. Okay?
-
Sally has an online poster business. Suppose Sally expects to sell 1,500 posters. Her average sales price per poster is $ 45 and her average cost per poster is $ 25. Her fixed expenses total $...
-
First Draw an ER Model please and then covert it into relational model seperate figures required thank you Each cinema is identified by its name and has its residency at an address which consists of...
-
Consider two different implementations, P1 and P2, of the same instruction set. There are five classes of instructions (A, B, C, D, and E) in the instruction set. The clock rate and CPI of each class...
-
The following table shows manufacturing data for various processors. If the number of dies per wafer is increased by 10% and the defects per area unit increases by 15%, find the die area and yield....
-
What is an advantage of letting workers self-control their work?
-
What are the time estimates in PERT? Why is beta probability distribution often used?
-
Cars enter the drive-through of a fast-food restaurant to place an order, and then they proceed to pay for the food and pick up the order. This is an example of a. a multichannel system. b. a...
-
Why are unjustified threats detrimental to the macroeconomic performance of a nation?
-
Suppose the current zero-coupon yield curve for risk-free bonds is as follows: a. What is the price per $100 face value of a three-year, zero-coupon, risk-free bond? b. What is the price per $100...
-
Which components are to be considered in the calling population? a. its size b. its arrival pattern c. the behaviour of the arrivals d. all of the above
-
Consider a small company run by a manager who is also the owner. If this company borrows funds, why might a moral hazard problem still exist?
-
suppose a nickel-contaminated soil 15 cm deep contained 800 mg/kg Ni, Vegetation was planted to remove the nickel by phytoremediation. The above-ground plant parts average 1% Ni on a dry-weight bas...
-
Calculate (1.666015625 10 0 1.9760 10 4 ) + (1.666015625 10 0 -1.9744 10 4 ) by hand, assuming each of the values are stored in the 16-bit half precision format described in Exercise 3.27 (and...
-
Based on your answers to 3.38 and 3.39, does (1.666015625 10 0 1.9760 10 4 ) + (1.666015625 10 0 -1.9744 10 4 ) = 1.666015625 10 0 (1.9760 10 4 + -1.9744 10 4 )?
-
Using the IEEE 754 floating point format, write down the bit pattern that would represent -1/4. Can you represent -1/4 exactly?
-
title and abstract for proposed project issue analysis The purpose of this assessment is for you to refine your thoughts by writing an abstract on a proposed project issue based on a literature...
-
How to manage the non-supportive stakeholder of the industrial accident according to the journal of (Savage et al., 1991)? Can you give me some explanation which is easy to understand and is a...
-
Based on the assessment of Rent The Runway's business in January 2010, if you were Hyman or Fleiss, would you proceed with scaling (accelerated business growth) at this time? What are the...
Study smarter with the SolutionInn App