Question: Develop cost codes for each element of the WBS shown in Figure 7.4. If you assign the account number 01-00-00 for the overall project, then

Develop cost codes for each element of the WBS shown in Figure 7.4. If you assign the account number 01-00-00 for the overall project, then a good account for the packaging and service area could be 01-01-00, and asphalt paving could be the account 01-01-02.

Figure 7.4

P&S Earth work Packaging & Service Area Foundation Asphalt Paving Concrete Areas

P&S Earth work Packaging & Service Area Foundation Asphalt Paving Concrete Areas Building Wall Shel Masonry Walls Excavation of Waste Water System Prefab Metal Walls Tie Drainage Lines Building Roof Built-up Root Roof Gutters Septic Tank Gas Station Mechanical Systems Fresh Water Lines Interior Finishes Interior Built-ins Floor Coverings Drywall Install Doors, Frames (As Required) etc. Sink, Basins, Toilet, etc. Painting Hot Water System Exterior Finishes Pneumatic Air System Glazing Brick Faade ~ Interior Floors Doors and Signage Electrical Systems

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

Sol... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Construction Project Management Questions!