Question: Develop cost codes for each element of the WBS shown in Figure 7.4. If you assign the account number 01-00-00 for the overall project, then
Develop cost codes for each element of the WBS shown in Figure 7.4. If you assign the account number 01-00-00 for the overall project, then a good account for the packaging and service area could be 01-01-00, and asphalt paving could be the account 01-01-02.
Figure 7.4

P&S Earth work Packaging & Service Area Foundation Asphalt Paving Concrete Areas Building Wall Shel Masonry Walls Excavation of Waste Water System Prefab Metal Walls Tie Drainage Lines Building Roof Built-up Root Roof Gutters Septic Tank Gas Station Mechanical Systems Fresh Water Lines Interior Finishes Interior Built-ins Floor Coverings Drywall Install Doors, Frames (As Required) etc. Sink, Basins, Toilet, etc. Painting Hot Water System Exterior Finishes Pneumatic Air System Glazing Brick Faade ~ Interior Floors Doors and Signage Electrical Systems
Step by Step Solution
There are 3 Steps involved in it
Sol... View full answer
Get step-by-step solutions from verified subject matter experts
