Question: Develop cost codes for each element of the WBS shown in Figure 7.4. Hint: If you assign the account number 01-00-00 for the overall project,
Develop cost codes for each element of the WBS shown in Figure 7.4. Hint: If you assign the account number 01-00-00 for the overall project, then a good account for the package and service area could be 01-01-00, and asphalt paving could be the account 01-01-02.
If mechanical work is expanded to cover location, material type, methods, and resources, the following partial list of work packages would be added to the hierarchy of the WBS. Figure 7.4 shows a WBS based on this partial development of work packages. 1. Excavation of waste water system. 2. Drainage tile installation-waste water. 3. Septic tank installation. 4. Fresh water lines (piping). 5. Sinks, basins, and tolets installation. 6. Hot wa:er system installation. 7. Preumatic air svstem installation
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock