Question: Develop cost codes for each element of the WBS shown in Figure 7.4. Hint: If you assign the account number 01-00-00 for the overall project,

Develop cost codes for each element of the WBS shown in Figure 7.4. Hint: If you assign the account number 01-00-00 for the overall project, then a good account for the package and service area could be 01-01-00, and asphalt paving could be the account 01-01-02.
Develop cost codes for each element of the WBS
If mechanical work is expanded to cover location, material type, methods, and resources, the following partial list of work packages would be added to the hierarchy of the WBS. Figure 7.4 shows a WBS based on this partial development of work packages. 1. Excavation of waste water system. 2. Drainage tile installation-waste water. 3. Septic tank installation. 4. Fresh water lines (piping). 5. Sinks, basins, and tolets installation. 6. Hot wa:er system installation. 7. Preumatic air svstem installation

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!