Question: The work breakdown structure for building a house. (levels 1 and 2) is shown below: She Preparation Masonry Carpentry Plumbing Finishing a) Add two level-3
The work breakdown structure for building a house. (levels 1 and 2) is shown below: She Preparation Masonry Carpentry Plumbing Finishing
a) Add two level-3 activities to each of the level-2 activities to pro- vide more detail to the WBS.
b) Select one of your level-3 activities and add two level-4 activi- ties below it.
Step by Step Solution
★★★★★
3.45 Rating (155 Votes )
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
