Question: Refer to E4.17. Assume the contractor has changed its offer. It now proposes to supply all the tablecloths needed at a price of $9.50 per
Refer to E4.17. Assume the contractor has changed its offer. It now proposes to supply all the tablecloths needed at a price of $9.50 per tablecloth. If Roccabruna accepts this offer, it will use the released space to produce 1,500 more napkins. The contribution margin per napkin is $3. To produce 1,500 additional napkins, one more production run will be needed at a cost of $200. Should Roccabruna accept the contractor’s latest offer? Why or why not? What additional factors should Roccabruna consider?
Data from E4.17
Roccabruna Corporation currently produces 5,000 tablecloths per period. The production cost per tablecloth is:
Batch-related overhead is $1,000 per batch and five batches are normally used to produce 5,000 tablecloths. Facility-sustaining overhead is $300,000 per period, and 10 percent is allocated to the tablecloth product line. A private contractor has offered to supply all of the labor needed for production at a cost of $2.50 per tablecloth. If this offer is accepted, direct laborers will be laid off and unit-related overhead will decrease by 70 percent. Should Roccabruna accept the contractor’s offer? Why or why not? What other factors should Roccabruna consider?
Direct materials Direct labor Unit-related overhead Total $5 1 2 1 $8
Step by Step Solution
3.44 Rating (170 Votes )
There are 3 Steps involved in it
Based on the information provided Roccabruna Corporation is currently producing 5000 tablecloths per period with a production cost per tablecloth of 8 which includes direct materials direct labor and ... View full answer
Get step-by-step solutions from verified subject matter experts