Question: While transferring load from one generator to another, what changes really take place during this process in terms of the prime movers GSR settingsand the
While transferring load from one generator to another, what changes really take place during this process in terms of the prime mover’s GSR settings and the droop lines? Which way the droop lines get adjusted and how do these changes transfer the load?
Step by Step Solution
3.41 Rating (145 Votes )
There are 3 Steps involved in it
When transferring load from one generator to another in a power system adjustments are made to the governor speed regulation GSR settings and droop ch... View full answer