Question: When a process is set up optimally, what are the typical upper and lower specification limits? A. Set equal to the upper and lower control

When a process is set up optimally, what are the typical upper and lower specification limits?
A. Set equal to the upper and lower control limits.
B. Set outside the upper and lower control limits.
C. Set inside the upper and lower control limits.
D. Set an equal distance from the mean value.

Step by Step Solution

3.28 Rating (157 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

B Set ... View full answer