Question: A production process uses a two- step operation. Tomorrows work wi11 consist of seven order s as shown below. Determine a job sequence that will
A production process uses a two- step operation. Tomorrow’s work wi11 consist of seven order s as shown below. Determine a job sequence that will minimize the total time required to fill the orders (i.e., the make-span) and determine the make-span.
.png)
Step by Step Solution
There are 3 Steps involved in it
Using Johnsons rule Time hr Order Step 1 Step 2 Sequence of assignment ... View full answer