Question: Peter Rourke, a loan processor at Royal Bank, has been timed performing four work elements, with the results shown in the following table. The allowances

a) What is the normal time?
b) What is the standard time?
Observations (minutes) Performance Rating (%) 110 95 Task Element 3 5 1 0.4 0.6 0.6 0.5 0.6 0.4 0.4 2 3 0.8 0.6 0.7 0.7 0.5 0.4 0.7 0.5 90 85 1.5 2.0 1.8 1.7 1.5 4 4)
Step by Step Solution
3.47 Rating (163 Votes )
There are 3 Steps involved in it
Observations minutes actual time Solutions Task Element Performance ... View full answer