Question: Peter Rourke, a loan processor at Royal Bank, has been timed performing four work elements, with the results shown in the following table. The allowances

Peter Rourke, a loan processor at Royal Bank, has been timed performing four work elements, with the results shown in the following table. The allowances for tasks such as this are personal, 7%; fatigue, 10%; and delay, 3%.

Observations (minutes) Performance Rating (%) 110 95 Task Element 3 5 1 0.4 0.6 0.6 0.5 0.6 0.4 0.4 2 3 0.8 0.6 0.7 0.7


a) What is the normal time?
b) What is the standard time?

Observations (minutes) Performance Rating (%) 110 95 Task Element 3 5 1 0.4 0.6 0.6 0.5 0.6 0.4 0.4 2 3 0.8 0.6 0.7 0.7 0.5 0.4 0.7 0.5 90 85 1.5 2.0 1.8 1.7 1.5 4 4)

Step by Step Solution

3.47 Rating (163 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

Observations minutes actual time Solutions Task Element Performance ... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (2 attachments)

PDF file Icon

1496_60b741225777b_647541.pdf

180 KBs PDF File

Word file Icon

1496_60b741225777b_647541.docx

120 KBs Word File

Students Have Also Explored These Related Operations Management Questions!