Question: Refer to Example 2. Determine if a plan to use subcontracting at a maximum rate of 50 units per period as needed with no overtime
Refer to Example 2. Determine if a plan to use subcontracting at a maximum rate of 50 units per period as needed with no overtime would achieve a lower total cost than the plan shown in Example 2. Again, plan for a zero inventory balance at the end of period 6. Regular production can be less than regular capacity.
Step by Step Solution
There are 3 Steps involved in it
Given Referto Example 2 The total cost for Example 2 was 4640 The forecasts forExample 2 are shown below Period 1 2 3 4 5 6 Total Forecast 200 200 300 ... View full answer