Question: Using the project information listed in the table below: a) Draw the AON network for the construction activity. b) Draw the AOA for the construction
Using the project information listed in the table below:
a) Draw the AON network for the construction activity.
b) Draw the AOA for the construction activity.

ACTIVITY A B C D E F TI G H - IMMEDIATE PREDECESSOR(S) - A B B D, E F, G DURATION (DAYS) 4 2 2 2 3 4 2 5 U 3
Step by Step Solution
3.42 Rating (168 Votes )
There are 3 Steps involved in it
a AON network b AOA network 20 ... View full answer