Question: Which method of measuring work progress is suitable for each of the following activities? a. Laying bricks for an exterior wall b. Safety inspection c.
Which method of measuring work progress is suitable for each of the following activities?
a. Laying bricks for an exterior wall
b. Safety inspection
c. Installation of a furnace
d. Project supervision
e. Multiple reinforced concrete footings
f. Setting up a patented formwork system for a wall g. Hydration of a concrete slab on a grade (assume a small slab)
h. Fishing16 an electric wire for an entire floor i. Excavation of earth (assume one type of soil)
j. Excavation of earth (assume several types of soil)
k. Dewatering l. Installing ceramic tile for a large area (involves a few subactivities)