Assume an auditor is evaluating a statistical attribute sample of 50 items that resulted in three deviations.
Question:
Assume an auditor is evaluating a statistical attribute sample of 50 items that resulted in three deviations. What should the auditor conclude if the tolerable deviation rate is 7 percent, the expected population deviation rate is 5 percent, and the allowance for sampling risk is 2 percent?
a. The planned assessed level of control risk should be modified because the tolerable deviation rate plus the allowance for sampling risk exceeds the expected population deviation rate.
b. The sample results should be accepted as support for the planned assessed level of control risk because the sample deviation rate plus the allowance for sampling risk exceeds the tolerable deviation rate.
c. The sample results should be accepted as support for the planned assessed level of control risk because the tolerable deviation rate less the allowance for sampling risk equals the expected population deviation rate.
d. The planned assessed level of control risk should be modified because the sample deviation rate plus the allowance for sampling risk exceeds the tolerable deviation rate.
Auditing A Practical Approach with Data Analytics
ISBN: 978-1119401742
1st edition
Authors: Raymond N. Johnson, Laura Davis Wiley, Robyn Moroney, Fiona Campbell, Jane Hamilton